111 Hayes Sheetrock Project
Marlborough

HUB was called into a cold storage tenant because their freezer room was not holding a low enough temperature during the summer months. HUB demo'd a large, 120 foot warehouse wall. Then installed a vapor barrier, insulation, and new sheetrock. After the project, the new insulation provided enough of a barrier that the room is now holding the correct temperature and meeting the tenant's needs.